Skip to Content

Antennas and Masts

A building permit* is required when:

Antenna/mast that is higher than 3m from the point it is attached to the building

Yes

Antenna/mast height more than 8 metres above the ground

Yes

*A Report & Consent will also be required.  

 

Applying for a building permit 

If a building permit is required, go to the building permits section to download the building permit application form, report and consent application form and for instructions on how to apply.

 

Still not sure if you need a permit?  

If you are not sure if you require a permit or have any questions feel free to contact us.