Skip to Content

Keysborough Industrial/Residential Buffer Landscape Plan

Council are looking to undertake a significant landscaping project along the reserve that interfaces the industrial "buffer" reservation zone that runs between Bend Road and Greens Road in Keysborough South. 

The project scope is outlined and described further in the attached plans:

Keysborough Industrial/Residential Buffer Landscape Plan.Plan and Section A (PDF 1.1MB)
Keysborough Industrial/Residential Buffer Landscape Plan.Plan and Section B (PDF 1.1MB)
Keysborough Industrial/Residential Buffer Landscape Plan.Plan and Section C (PDF 1.1MB)
Keysborough Industrial/Residential Buffer Landscape Plan.Plan and Section D (PDF 1.1MB)
Keysborough Industrial/Residential Buffer Landscape Plan.Plan and Section E (PDF 1.1MB)

Stage 1 of the landscape project commenced in December 2017 and is expected to be completed by the end of June early or early July 2018 (subject to suitable weather conditions). Stage 1 of the project will focus on the area between Chandler Road and Greens Road.

Stage 2 of the landscape project is the area from Chandler Road to Bend Road, construction of this section as far as practicable (i.e. the areas that have been constructed to date by the developers) is expected to be undertaken concurrently with stage 1and is also expected to be completed by the end of June early July 2018 (subject to suitable weather conditions).

For further information on the project contact:

By mail:
Mr Michael Smith
Coordinator Open Space Projects
City Improvement
PO Box 200
Dandenong 3175

Email: Michael.Smith@cgd.vic.gov.au
Telephone: 8571 5264